WWTP Dhahran Project, Aramco
PROJECT DETAILS
Project ID: [23663] | |
Country: | Saudi Arabia |
Year: | 2008 |
Application: | Raw Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 180 m |
Nominal Diameter DN: | 1200 mm |
Nominal Pressure PN: | 10 bar |
Contractor: | M.S. Al-Suwaidi |