Wastewater Pipeline for Samsung Factory in Trnava Slovakia
Industrial facilities of this size require an adequate water supply and sewage disposal system. 2400 m HOBAS CC-GRP Pipe Systems of DN 1000 now collect and discharge the wastewater. Due to a required installation depth of 3.5 to 7 m, HOBAS Pipes were chosen with a nominal stiffness of SN 10000.The project started off with quite some complications. Ground breaking was postponed over and over again and finally, a competitor of HOBAS won the tender. The first pipe delivery arrived on time yet those to follow were delayed and ended up in vain promises. These delays threatened to result in huge financial losses for the contractor and the situation demanded immediate action. When the pipe supplier repeatedly broke contract terms and could not meet deadlines, the contractor began looking for alternatives and opened up negotiations with HOBAS. Within 72 hours the contractor accepted the offer by HOBAS and signed the contract. On the very same day, 96 m HOBAS Pipes were delivered to the construction site. During the following weeks HOBAS delivered a total of 2400 m pipes according to the given schedule and on time, so that the construction of the pipeline was successfully completed after 50 days.
More information about this application
PROJECT DETAILS
Project ID: [11687] | |
Country: | Slovakia |
City: | Trnava |
Year: | 2007 |
Application: | Sewer |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 2400 m |
Nominal Diameter DN: | 1000 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 10000 N/m2 |