Wastewater Pipeline extension in city of Minsk
Thus, an additional pipeline discharging up to 100,000 m³ wastewater was designed and realized in 2005 for the industrial area of Minsk. A second line with the same capacity followed one year later. In order to find the suitable pipe material, the project engineers thoroughly compared the different characteristics of possible alternatives and finally decided to utilize HOBAS CC-GRP SewerLine systems. Parameters such as hydraulic characteristics, life-time and corrosion resistance clearly spoke for the top-quality products. Apart from the second line, HOBAS GRP products were also installed for the water treatment plant itself to connect various mechanical and biological parts of the facility and to transport the biologically activated sludge. HOBAS System Poland delivered the SewerLine DN 2000, SN 5000 in 2007 and the contractor Minskvodostroj completed the unobstructed installation of 428 m within 2 months only. Thanks to the easy assembly and light weight of HOBAS products, the installation time and construction costs of the relatively large diameter line could be kept to a minimum.
More information about this application
PROJECT DETAILS
Project ID: [11669] | |
Country: | Belarus |
City: | Minsk |
Year: | 2007 |
Application: | Sewer |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 428 m |
Nominal Diameter DN: | 2000 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 5000 N/m2 |