Wastewater network’s diversion due to the extention of the Mayol’s stadium stands in Toulon (83)
PROJECT DETAILS
Project ID: [5653] | |
Country: | France |
City: | Toulon |
Year: | 2015 |
Application: | Sewer |
Installation: | Microtunneling |
Technology: | Hobas |
Total Length: | 38 m |
Nominal Diameter DN: | 752 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 100000 N/m2 |