Waste Water Treatment Plant Tg. Frumos
PROJECT DETAILS
Project ID: [6677] | |
Country: | Romania |
City: | Iasi |
Year: | 2013 |
Application: | Sewer, Wastewater Treatment Plant |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 239 m |
Nominal Diameter DN: | 800 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 5000 N/m2 |