Waste Water Treatment Plant Suceava
PROJECT DETAILS
Project ID: [9108] | |
Country: | Romania |
City: | Suceava |
Year: | 2010 |
Application: | Sewer |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 798 m |
Nominal Diameter DN: | 600 | 800 | 1000 | 1200 mm |
Nominal Pressure PN: | 1 | 1 | 1 | 1 bar |
Nominal Stiffness SN: | 5000 | 5000 | 5000 | 5000 N/m2 |