V-C Corridor (RS) bridges Lukavička rijeka
PROJECT DETAILS
Country: | Bosnia and Herzegovina |
City: | Doboj |
Year: | 2021 |
Application: | Drainage |
Installation: | Above Ground |
Technology: | Hobas |
Total Length: | 1080 m |
Nominal Diameter DN: | 300 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 10000 N/m2 |
Contractor: | Regeneracija |
Client: | Motorways Republic of Srpska |