Turek Lesna
PROJECT DETAILS
Project ID: [5329] | |
Country: | Poland |
City: | Turek |
Year: | 2016 |
Application: | Drainage |
Installation: | Above Ground |
Technology: | Hobas |
Total Length: | 360 m |
Nominal Diameter DN: | 500 | 600 | 700 | 900 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 10000 | 40000 | 64000 N/m2 |