Tremosna – relocation na I/27, bridge SO 205
PROJECT DETAILS
Project ID: [9281] | |
Country: | Czech Republic |
City: | Tremosna |
Year: | 2010 |
Application: | Sewer |
Installation: | Above Ground |
Technology: | Hobas |
Total Length: | 420 m |
Nominal Diameter DN: | 250 | 200 mm |
Nominal Pressure PN: | 1 | 1 bar |
Nominal Stiffness SN: | 10000 | 10000 N/m2 |