TABUK CONSTR. OF WATER N/W PH. 3
PROJECT DETAILS
Project ID: [24474] | |
Country: | Saudi Arabia |
City: | Riyadh |
Year: | 2008 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 7822 m |
Nominal Diameter DN: | 400 | 800 mm |
Contractor: | AL-HARBI TRADING &CONTRACTING CO. |