Storm Proj. Al-Limabah
PROJECT DETAILS
Project ID: [25301] | |
Country: | Saudi Arabia |
Year: | 2007 |
Application: | Drainage |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 1668 m |
Nominal Diameter DN: | 400 mm |
Nominal Pressure PN: | 3 bar |
Contractor: | Fahad Saleh Ali Al-Bareet |
Client: | Municipality |