Special Profile 1000 Meter Sewer Reabilitation in Basel
After 70 years of service the approximately 1-km-long deteriorated concrete relief sewer Leimgrubenweg/Walkeweg in the Swiss canton Basel-Stadt Switzerland could be no longer maintained with spot repairs. Extensive preliminary investigations and an in-depth evaluation of possible solutions commissioned by the Municipal Works Service Department for Municipal Sewage of the canton Basel-Stadt in Switzerland led to a sliplined HOBAS NC Line solution that ensures trouble-free service for a minimum of 50 years.
More information about this application
PROJECT DETAILS
Project ID: [8582] | |
Country: | Switzerland |
City: | Basel |
Year: | 2011 |
Application: | Sewer, NC-Pipes (non-circular) |
Installation: | Relining |
Technology: | Hobas |
Total Length: | 1000 m |
Nominal Diameter DN: | Non-Circular mm |
Nominal Pressure PN: | 1 bar |