Sea Water intake Brazil (LNG Terminal)
PROJECT DETAILS
Project ID: [35605] | |
Country: | Brazil |
City: | Porto do Açu, São João da Barra |
Year: | 2019 |
Application: | Cooling and Process Water |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 7123 m |
Nominal Diameter DN: | 600 | 700 | 900 | 1500 mm |
Nominal Pressure PN: | 16 | 20 bar |
Nominal Stiffness SN: | 10000 N/m2 |
Client: | ACCIONA INDUSTRIAL, S.A. |