Safco Ibn-Sina
PROJECT DETAILS
Project ID: [33491] | |
Country: | Saudi Arabia |
City: | Jubail |
Year: | 1992 |
Application: | Chemical Industry |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 4030 m |
Nominal Diameter DN: | 1600 | 2000 mm |
Nominal Pressure PN: | 3 bar |
Contractor: | Abu Al-Enain |
Client: | Sabic |