Relining Galleria San Valentino – Stelvio
PROJECT DETAILS
Country: | Italy |
City: | San Valentino Alla Muta |
Year: | 2021 |
Application: | Hydropower |
Installation: | Relining |
Technology: | Flowtite |
Total Length: | 1002 m |
Nominal Diameter DN: | 2700 mm |
Nominal Pressure PN: | 6 bar |
Nominal Stiffness SN: | 10000 N/m2 |
Contractor: | ROTECH, SRL |
Client: | ROTECH, SRL |