Rehabilitation of the wastewater network in St Pierre de Quiberon (56)
PROJECT DETAILS
Project ID: [6173] | |
Country: | France |
City: | St Pierre de Quiberon |
Year: | 2014 |
Application: | Sewer |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 1206 m |
Nominal Diameter DN: | 150 | 200 | 400 | 800 mm |
Nominal Pressure PN: | 1 | 1 | 1 | 1 bar |
Nominal Stiffness SN: | 10000 | 10000 | 10000 | 10000 N/m2 |