R.C. Cont. # 185-C13
PROJECT DETAILS
Project ID: [30714] | |
Country: | Saudi Arabia |
Year: | 2002 |
Application: | Seawater |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 900 m |
Nominal Diameter DN: | 2000 | 2000 mm |
Nominal Pressure PN: | 3 bar |
Contractor: | Saudi Binladen Group |
Client: | Royal Commission |