R.C. Cont. 136-C4
PROJECT DETAILS
Project ID: [26764] | |
Country: | Saudi Arabia |
Year: | 2006 |
Application: | Seawater |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 4100 m |
Nominal Diameter DN: | 2000 mm |
Nominal Pressure PN: | 6 bar |
Contractor: | Saudi Binladen Group |
Client: | Royal Commission |