Pump station in Cascine (Pisa)
PROJECT DETAILS
Project ID: [6144] | |
Country: | Italy |
City: | Cascine (PI) |
Year: | 2014 |
Application: | Irrigation |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 837 m |
Nominal Diameter DN: | 400 | 500 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 10000 N/m2 |