Pioneer Shire Counc. Mackay
PROJECT DETAILS
Project ID: [20370] | |
Country: | Australia |
Year: | 1986 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 860 m |
Nominal Diameter DN: | 450 mm |
Nominal Pressure PN: | 10 bar |
Nominal Stiffness SN: | 5000 N/m2 |