Ostrołęka Elektrownia
PROJECT DETAILS
Country: | Poland |
City: | Ostrołęka |
Year: | 2020 |
Application: | Cooling and Process Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 276 m |
Nominal Diameter DN: | 3000 mm |
Nominal Pressure PN: | 6 bar |
Nominal Stiffness SN: | 10000 N/m2 |
Contractor: | GE Power |
Client: | GE Power |