Nowa Sarzyna – Nowa Sarzyna III
PROJECT DETAILS
Country: | Poland |
City: | Nowa Sarzyna |
Year: | 2022-2023 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 660 m |
Nominal Diameter DN: | 500 mm |
Nominal Pressure PN: | 10 bar |
Nominal Stiffness SN: | 10 N/m2 |
Contractor: | WOD-REM Sp. z o.o |