Nongan, the second water resource project
PROJECT DETAILS
Project ID: [33077] | |
Country: | China |
City: | Nongan County, Jilin Province |
Year: | 1995 |
Application: | Potable Water |
Installation: | |
Technology: | Flowtite |
Total Length: | 5188 m |
Nominal Diameter DN: | 500 | 500 mm |
Nominal Pressure PN: | 6 | 6 bar |
Nominal Stiffness SN: | 5000 | 5000 N/m2 |
Contractor: | No.2 Engineering Company of China Oil and Natural Gas Pipeline Bureau |
Client: | Irrigation Bureau of Nongan County |