Mirfa project
PROJECT DETAILS
Project ID: [8946] | |
Country: | United Arab Emirates |
City: | Abu Dhabi |
Year: | 2010 |
Application: | Other Pipelines |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 450 m |
Nominal Diameter DN: | 250 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 1500 N/m2 |