Maznab Project
PROJECT DETAILS
Project ID: [33817] | |
Country: | Saudi Arabia |
Year: | 1984 |
Application: | Raw Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 3180 m |
Nominal Diameter DN: | 350 | 400 mm |
Nominal Pressure PN: | 12 bar |
Contractor: | Ali Saad Trading |