Lysåelva kraftverk
PROJECT DETAILS
Country: | Norway |
City: | Borkenes |
Year: | 2022 |
Application: | Hydropower |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 996 m |
Nominal Diameter DN: | 800 mm |
Nominal Pressure PN: | 6 | 10 | 20 | 25 bar |
Nominal Stiffness SN: | 5000 N/m2 |
Consultant: | Norconsult AS |
Client: | Fjellkraft AS |