LK138 Oswiecim – crossing under railway
PROJECT DETAILS
Project ID: [7211] | |
Country: | Poland |
City: | Oswiecim |
Year: | 2012 |
Application: | Drainage |
Installation: | Microtunneling |
Technology: | Hobas |
Total Length: | 46 m |
Nominal Diameter DN: | 400 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 200000 N/m2 |