Kremenchug – UA GOK Poltava – Pipelines in Tunnel
PROJECT DETAILS
Country: | Ukraine |
City: | Kremenchug |
Year: | 2021-2022 |
Application: | Other Pipelines |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 14000 m |
Nominal Diameter DN: | 1400 | 1000 | 600 | 500 mm |
Nominal Pressure PN: | 6 | 10 | 10 | 10 bar |
Nominal Stiffness SN: | 5000 | 5000 | 5000 | 5000 N/m2 |