Integrated water cycle for the city of Shumen, Stage 2
PROJECT DETAILS
Project ID: [5810] | |
Country: | Bulgaria |
City: | Shumen |
Year: | 2015 |
Application: | Sewer |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 5259 m |
Nominal Diameter DN: | 600 | 900 | 1400 | 1500 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 5000 | 10000 N/m2 |