HOBAS GRP Pipes for Hydropower Plants in the Czech Republic
In 2011, HOBAS Czech Republic started cooperating with Kredit Centrum s.r.o., a Czech company that operates several hydropower plants throughout the country. That same year this partnership resulted in a first order: HOBAS Pipes were installed for two hydropower plants in the town Tanvald. Working very closely with the designers of the projects the technical department of HOBAS CZ slightly modified the original idea to make full use of the advantages HOBAS Pipes offer: angular cut shorter pipe elements of 2 and 3 meter length enabled the construction company to closely follow the route originally planned by the client. HOBAS Experts prepared a detailed layout plan to facilitate installation. To cope with the high groundwater level on site geotextiles were employed and fixed with gravel to secure the pipes and keep them in place. In total 221 meters of HOBAS Pipes DN 1400, SN 5000, PN 6 were installed open cut: 91 m at one hydropower plant and 130 m at another facility 0.5 km from the first. In both cases, HOBAS Pipes were used to connect the future pipeline to the already existing structure of the hydropower plants. HOBAS Fittings were delivered in addition to the pipes. The client was very satisfied with the technical support prior to and during installation of the HOBAS Experts, the installation was fast and went smoothly.
More information about this application
PROJECT DETAILS
Project ID: [7801] | |
Country: | Czech Republic |
City: | Tanvald |
Year: | 2011 |
Application: | Hydropower |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 221 m |
Nominal Diameter DN: | 1400 mm |
Nominal Pressure PN: | 6 bar |
Nominal Stiffness SN: | 5000 N/m2 |