HOBAS Drainage System for Gurk area
Product benefits speak for themselves: The high corrosion resistance of the HOBAS CC-GRP Pipe Systems guarantees long maintenance intervals, reducing the high costs to a minimum for maintenance work in areas difficult to access. Great care has to be taken when building in environmentally sensitive zones, which is why absolute leak tightness was top priority for the HOBAS CC-GRP Pipe System. Furthermore, an additional specification in bridge construction requires the pipes to absorb the linear extension occurring in the area of the bridge abutments. HOBAS dilation couplings made of stainless steel guarantee the required integrity of the pipeline in the event of such elongation here. Installation from above Pipe installation began in March 1999. Their low weight and easy handling meant that a simple crane was all that was required. The pipes were lowered through the gap between the two carriageways and suspended from steel girders with supports located every 3 meters. Wooden saddles with a layer of rubber ensure they do not sustain damage. A walkway facilitates maintenance work on both sides of the 215 meter long bridge. It was not least thanks to the length and easy installation of the HOBAS CC-GRP Pipe Systems that the Gurk Bridge drainage system was completed in only four weeks.
More information about this application
PROJECT DETAILS
Project ID: [16919] | |
Country: | Austria |
City: | Gurk |
Year: | 1999 |
Application: | Drainage |
Installation: | Above Ground |
Technology: | Hobas |
Total Length: | 289 m |
Nominal Diameter DN: | 800 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 10000 N/m2 |