HAIL WATER SUPPLY PROJECT
PROJECT DETAILS
Project ID: [24432] | |
Country: | Saudi Arabia |
City: | Riyadh |
Year: | 2008 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 60000 m |
Nominal Diameter DN: | 300 | 300 mm |
Contractor: | MUTLAQ AL-GHOWAIRI EST. |