Gelmes Oil Field
PROJECT DETAILS
Project ID: [31732] | |
Country: | Turkmenistan |
City: | Gotur-Depe |
Year: | 2000 |
Application: | Chemical Industry |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 37800 m |
Nominal Diameter DN: | 300 | 300 mm |
Nominal Pressure PN: | 25 | 25 bar |
Nominal Stiffness SN: | 10000 | 10000 N/m2 |
Contractor: | AFIL |
Client: | Turkmenneft |