Gdynia
PROJECT DETAILS
Project ID: [23107] | |
Country: | Poland |
City: | Gdynia |
Year: | 2009 |
Application: | Drainage |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 54 m |
Nominal Diameter DN: | 200 | 300 mm |
Nominal Pressure PN: | 1 | 1 bar |
Consultant: | Edward Trocka |
Contractor: | Kolanko |
Client: | UM Gdynia |