ETAP de Iznajar
PROJECT DETAILS
Project ID: [24883] | |
Country: | Spain |
City: | Cordoba |
Year: | 2008 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 541 m |
Nominal Diameter DN: | 300 | 300 mm |
Nominal Pressure PN: | 10 | 10 bar |
Nominal Stiffness SN: | 10000 | 10000 N/m2 |
Contractor: | SACYR, S.A.U. |
Client: | Acuavir |