Dąbrowa Górnicza – Tramwaj zad. 2.5 od Pętli KWK Paryż do Al. Róż
PROJECT DETAILS
Country: | Poland |
City: | Dąbrowa Górnicza |
Year: | 2022 |
Application: | Retention System, Drainage |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 300 m |
Nominal Diameter DN: | 500 | 600 | 1000 mm |
Nominal Pressure PN: | 1 | 1 | 1 bar |
Nominal Stiffness SN: | 10000 | 10000 | 10000 N/m2 |