D-32 UMM AL-NAR TANKER FILLING
PROJECT DETAILS
Project ID: [29535] | |
Country: | United Arab Emirates |
Year: | 2004 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 84 m |
Nominal Diameter DN: | 100 | 200 mm |
Contractor: | AL KARRANI GROUP |
Client: | ADWEA |