Collegamento Temo-Cuga condotta sul rio Sette Orta
PROJECT DETAILS
Project ID: [22738] | |
Country: | Spain |
City: | Sardegna (Italy) |
Year: | 2009 |
Application: | Raw Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 3065 m |
Nominal Diameter DN: | 1600 | 1600 mm |
Nominal Pressure PN: | 10 | 10 bar |
Nominal Stiffness SN: | 5000 | 5000 N/m2 |
Consultant: | ENG. FRANCESCO PAOLO NACCARI, |
Contractor: | COSEDIL, SPA |
Client: | CONSORZIO DI BONIFICA DELLA NURRA |