Colector Salmueras Fase I lote 1 Castellgali-El Cairat
PROJECT DETAILS
Country: | Spain |
City: | Monistrol De Montserrat |
Year: | 2022 |
Application: | Sewer |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 4662 m |
Nominal Diameter DN: | 800 mm |
Nominal Pressure PN: | 10 bar |
Nominal Stiffness SN: | 5000 N/m2 |
Contractor: | UTE SALMORRES LOT1 |
Client: | INFRAESTRUCTURES DE CATALUNYA |