CL-5 Extension of the Carai water supply system to Tiream/Ghenci and the sewage system in the Carai cluster
PROJECT DETAILS
Country: | Romania |
City: | Satu Mare |
Year: | 2022 |
Application: | Manhole, NC-Pipes (non-circular) |
Installation: | Open Trench |
Technology: | Amiblu |
Total Length: | 50 m |
Nominal Diameter DN: | 1082 | 1652 | 1000 | 1400 mm |
Nominal Pressure PN: | 1 | 1 | 1 | 1 bar |
Nominal Stiffness SN: | 5000 | 10000 N/m2 |
Contractor: | Gogan Structure SRL |
Client: | APASERV Satu Mare SA |