Central Hidroeléctrica de Calheta
PROJECT DETAILS
Project ID: [35611] | |
Country: | Portugal |
City: | Sacavem (Louro) |
Year: | 2019 |
Application: | Hydropower |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 395 m |
Nominal Diameter DN: | 800 | 1000 | 1500 mm |
Nominal Pressure PN: | 10 bar |
Nominal Stiffness SN: | 5000 | 10000 N/m2 |
Client: | GRUPO AFAVIAS |