Bridge, street and highway drainage Bottrop (Brücke über die Emscher)
PROJECT DETAILS
Project ID: [12298] | |
Country: | Germany |
City: | Bottrop |
Year: | 2006 |
Application: | Drainage |
Installation: | |
Technology: | Hobas |
Total Length: | 960 m |
Nominal Diameter DN: | 150 | 200 | 300 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 5000 N/m2 |