Bridge pipeline in San Benigno (Genova)
PROJECT DETAILS
Project ID: [5550] | |
Country: | Italy |
City: | San Benigno (GE) |
Year: | 2015 |
Application: | Drainage |
Installation: | Above Ground |
Technology: | Hobas |
Total Length: | 450 m |
Nominal Diameter DN: | 300 | 400 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 5000 N/m2 |