B54, Instandsetzung Talbrücken Ronnewinkel und Oehringhausen u. a.
PROJECT DETAILS
Project ID: [25078] | |
Country: | Germany |
City: | Olpe |
Year: | 2007 |
Application: | Drainage, Other Pipelines |
Installation: | Above Ground |
Technology: | Flowtite |
Total Length: | 480 m |
Nominal Diameter DN: | 150 | 250 mm |
Nominal Pressure PN: | 1 | 1 bar |
Nominal Stiffness SN: | 10000 | 10000 N/m2 |
Contractor: | STH Hüttental GmbH Netphen |
Client: | LSB Siegen |