Arar Water Network, KSA
PROJECT DETAILS
Project ID: [30194] | |
Country: | Saudi Arabia |
City: | Riyadh |
Year: | 2003 |
Application: | Potable Water |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 8262 m |
Nominal Diameter DN: | 250 | 500 mm |
Contractor: | Al Nahir Trading & Contracting est |