Aprovechamiento hidroeléctrico Río Porma Salto Boñar
PROJECT DETAILS
Project ID: [27873] | |
Country: | Spain |
City: | León |
Year: | 2005 |
Application: | Hydropower |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 1640 m |
Nominal Diameter DN: | 2800 | 2800 mm |
Nominal Pressure PN: | 6 | 6 bar |
Nominal Stiffness SN: | 5000 | 5000 N/m2 |
Contractor: | BEGAR |
Client: | ROYO ENERGÍA |