Amiscreen Staukanal Schnellgrabenbrücke 48 m³
PROJECT DETAILS
Country: | Germany |
City: | Rostock |
Year: | 2018 |
Application: | Retention System, Drainage |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 13 m |
Nominal Diameter DN: | 2500 mm |
Nominal Pressure PN: | 1 bar |
Contractor: | ASA-Bau GmbH |
Client: | Nordwasser GmbH Rostock |