Amiblu GRP penstock for hydropower plant in Uganda
Kyambura Power Station is a 7.6 MW run-of-river hydropower station currently under construction in the Rubirizi district in Western Uganda. Amiblu supplied the 880 m long penstock built of Flowtite GRP pressure pipes DN 2200, PN 10, and DN 2100, PN 12 (440 m each), as well as flanges, bends, reducers and a flanged tee.
The GRP penstock connects the forebay with the power station, which will be equipped with two Francis turbines. Kyambura Power Station will be ready to start producing electricity by the end of 2018 and have and annual production of 36.7 GWh.
More information about this application
PROJECT DETAILS
Project ID: [34810] | |
Country: | Uganda |
City: | Rubirizi district |
Year: | 2017-2018 |
Application: | Hydropower |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 880 m |
Nominal Diameter DN: | 2100 | 2200 mm |
Nominal Pressure PN: | 12 | 10 bar |