Al Markaz development Infrastructure package
PROJECT DETAILS
Project ID: [7873] | |
Country: | United Arab Emirates |
City: | Abu Dhabi |
Year: | 2011 |
Application: | Drainage |
Installation: | Open Trench |
Technology: | Hobas |
Total Length: | 3000 m |
Nominal Diameter DN: | 450 mm |
Nominal Pressure PN: | 1 bar |
Nominal Stiffness SN: | 2500 N/m2 |