Al-Madhar
PROJECT DETAILS
Project ID: [32310] | |
Country: | Saudi Arabia |
Year: | 1998 |
Application: | Sewer |
Installation: | Open Trench |
Technology: | Flowtite |
Total Length: | 1632 m |
Nominal Diameter DN: | 500 mm |
Nominal Pressure PN: | 3 bar |
Nominal Stiffness SN: | 5000 N/m2 |
Contractor: | Al-Marafik Const. |